Progress Report
Wednesday, September 28, 2011 at 17:59
Mark Forster

As a result of my testing of the Final Version over the last four days, I’ve felt it necessary to make some changes. The main problem was that I wasn’t satisfied that unfinished tasks were being processed sufficiently often.

To combat this, I’ve slowed the overall rate of progress through the system so that more time can be spent on finishing.

I’ve also re-introduced “dismissal” into the system, which brings back its filtering capability, which was in danger of getting lost.

Article originally appeared on Get Everything Done (http://markforster.squarespace.com/).
See website for complete article licensing information.