Report on Progress
Friday, March 3, 2017 at 11:37
Mark Forster

FVP was working very well for me until yesterday evening when I started to become oppressed by the length of time it was taking to scan between tasks when I was working near the beginning of the list - my task list is currently 79 tasks spread over ten pages. I started making use of the “let-out” rule “If you know you want to do something now, do it now”, and in no time at all I found myself revitalized. I also found myself doing what amounted to the Fast Version of FVP and I decided to stick with it. 

I’ve decided that I haven’t changed systems on the following grounds:

1) Fast FVP is just a version of FVP. The basic system is the same, and the two versions operate on a continuum.

2) It is in the spirit of using a long trial to make improvements to a system. We discussed this in the run-up to the Challenge.

Article originally appeared on Get Everything Done (http://markforster.squarespace.com/).
See website for complete article licensing information.