To Think About . . .

It’s not whether you win or lose, it’s how you place the blame. Oscar Wilde

 

 

 

My Latest Book

Product Details

Also available on Amazon.com, Amazon.fr, and other Amazons and bookshops worldwide! 

Search This Site
Log-in
Latest Comments
My Other Books

Product Details

Product Details

Product Details

The Pathway to Awesomeness

Click to order other recommended books.

Find Us on Facebook Badge

Entries in FVP (9)

Saturday
Apr292017

No Question FVP

Here’s the system I’m using at the moment, which I’m finding works very well so far.

As the name suggests, it’s basically FVP without the questions.

As in FVP the first task on the list is always dotted.

You scan the list by dotting what stands out. As in FVP you then move backwards through the list to action the tasks.

When you have taken action on a task, you scan from that task to the end of the list without bothering to look at the preceding dotted task. When no tasks stand out you then go back to the preceding dotted task and do that.

In other words the basic algorithm is exactly the same as in FVP - but without asking any questions.

The great advantage over FVP is that the system itself requires hardly any mental effort. This makes it much faster and easier. And since the basis for selection is “standing out” there is little or no resistence to the tasks themselves.

Wednesday
Jun102015

Dotting Power

In the FV/FVP Forum there has been quite a lot of discussion about the selection of tasks (which is done by putting a dot before the task).

I want to write a little bit about how to control this selection to one’s best advantage.

First of all the good news is that the process is controllable. In fact it’s possible to exercise quite a considerable degree of control without prejudicing the principle that selection should be done by intuition rather than consciously.

For instance, take the question of how you can ensure that the early tasks on your list get actioned. This can be done very easily by instructing your mind to select no tasks at all, except really urgent ones. This will take you back quite quickly to the first task on the list. How do you instruct your mind to do this? In the same way that you instruct your body to walk faster, walk slower or stand still. You just do it!

You can then instruct your mind to give preference to earlier tasks and lay off selecting recently entered tasks. That will keep you working in the early part of the list, but without having to stick rigidly to a pre-selected order. You instruct your mind in the same way you’d instruct your body to walk fast for a short time and then slow down. You can leave the mechanics of doing that to your body to sort out!

Or if you instead want to clear recently arrived minor tasks, instruct your mind to keep selecting tasks towards the end of the list.  The point is that you have a large degree of control over which part of the list you are going to be working in.

You can even fine tune it so that you are paying attention to both ends of the list, but not the the middle. Why would you want to do that? Well, take a situation in which you are clearing some old tasks, but some of them need several sessions to get them cleared.

One the whole though, I prefer most of the time to allow my mind to select whatever it wants without any special instructions. But I know I can take more control as and when I need to.

A few things to watch:

  1. The more dots you put on the list, the more inflexible the list becomes. Just instruct your mind to select less dots rather than more. You can fine-tune this until you get the list at the right balance between flexibility and direction.
  2. Keep the list well-weeded. It’s a good idea to have a task on the list called “Weed List”. Be ruthless!
  3. Don’t forget “little and often”. The list is very good at multiple sessions on tasks. You just keep re-entering them at the end of the list.
  4. If you need to do tasks in a certain order (i.e. you need to do x before you can do y), remember that dotted tasks are done in the reverse order to list order. So if they are already in reverse order you can dot both tasks, but if they are in the right order on the list then only dot the one you want to do first, and you can then pick up the second one on the next scan.
  5.  If you have an urgent task, just write it at the end of the list. It will be picked up on the next scan (i.e. when you’ve finished the task you are working on at the moment) and will then be the next task to do.
  6. If you know that you don’t want the next scan to select anything, then skip the scan altogether - or just skim it to make sure.
  7. Try and avoid special markings, groupings, tags and similar devices. They all add to the administrative load of running the list.

And finally use pen/pencil and paper unless you are completely addicted to electronic means. It’s far faster and you are not dependent on energy supplies, connectivity or having enough money to pay the bills. It’s also better for the planet!

Tuesday
Jun092015

Follow Up to the Productive Day Challenge

The purpose of yesterday’s Productive Day Challenge was not to show how superior I am to other people. I am naturally disorganised, lazy and procrastinating - and I have no godlike powers of any sort. Far from it.

The purpose was to show how much one person can achieve in a day using a powerful time management system. And the message is that anyone can do the same if they use exactly the same methods as I did. You can easily verify it for yourself by writing out a similar list and putting the methods to work. But you do need to use exactly the same methods. I’m not claiming that the methods I used are the only methods that can achieve the same sort of results, but what I am saying is that if you use any variation whatsoever on what I did then you are not using the methods I used to achieve the results.

Apart from a couple of items, everything I wanted to achieve during the day was already on my normal everyday list, which has about 60-70 tasks on it. I worked off this list in the normal way. So I did not make any special preparations for the Productive Day, nor did I work in any way different from a normal day.

During the day I did not feel any resistance or sense of pressure. I just carried on working the system according to the rules. When I wrote the definition of what would make me consider the day to have been productive, I had a pretty good idea already of how much I could do in a day. So I had no real doubts that I could get everything on the list done. At the end of the day I didn’t feel tired or exhausted. I felt just the same as I feel at the end of a normal day. In fact this was a normal day.

Things I didn’t do

I didn’t bother to ask the question mentioned in the rules. Experience is showing that it’s quicker and just as effective to select the tasks without asking the question. Just go for what feels ready to be done.

I did not use electronic means. Paper and pen is faster and has less administrative overload.

I did not use any special markings or groupings. These all add to the administrative overload - better off without them.

I didn’t worry about finishing. I knew that the list was within my capability, so I just relaxed and got on with it.

I didn’t let “inbox zero” slip. Building up backlogs is the best way of bogging yourself down. I emptied all “inbox” tasks (email, Evernote, paper, comments, and doing the dishes) multiple times during the day.

I didn’t try to mark up (“dot”) too many tasks at once. The fewer the dots the more flexible the list.

I didn’t confine myself to what was on the Productive Day list. I actually did quite a lot of other tasks as well. I also exceeded my target amount for several tasks which were part of the Productive Day.

Sunday
Jun072015

The Productive Day Challenge

What I am going to do is define what I would need to have done in order to consider tomorrow (Monday) to be a productive day. I will be using FVP as my time management system.

I am going to use my list as it is - which has most of the tasks on it already. I’m not going to cheat by moving them all to the end of the list.

I’ll report back on how many of the tasks I succeed in doing.

So here goes - I would consider tomorrow to be a productive day if:

I have zero inbox at the end of the day in


Email
Paper
Evernote Inbox
Doing the dishes


I have walked at least four miles [5.17 miles]
I have done 100 press ups
I have done The Plank exercise for at least 90 seconds [110 seconds - ai yai yai!]
I have sold our unused car for scrap [got £60!]
I have, as Press Officer, edited the photos for yesterday’s Croquet Tournament, Friday’s Golf Tournament and last week’s Golf Club Dinner.
I have done at least one day’s Glossika French lesson [2 days’ Lessons]
I have listened to at least one chapter of Genesis and St Matthew’s Gospel in the original languages [2 chapters Genesis, 1 Exodus, 2 St Matthew]
I have sorted out my regular donation to the Bursary Fund
I have invited L to take part in September’s Charity walk
I have checked whether R has decided to take part in the walk.
I have emailed an update to those who have already agreed to take part in the above Charity Walk
I have said the Joyful Mysteries of the Rosary
I have telephoned my dentist re work needed
I have read at least something in the Qu’ran and the Hadith
I have notified my bank about my forthcoming trip
I’ve written a second draft of my paper for the Finance Committee about Running a Legacy Campaign
I sorted out a new contract for my smart phone
I’ve sent details of my expenses to my financial adviser
I have revised my plan as Press Officer
I have revised my plan for publicity for my new book

And I nearly forgot…
I have kept up to date with the comments on my website [17 replies written today]

Sunday
Jun072015

A Few More FVP Stats

Here are a few more stats in addition to my last post.

After one week of FVP ending on Saturday evening:

Saturday: 95 tasks entered, 44 remaining

Friday: 93 tasks entered, 13 remaining

Thursday: 74 tasks entered, 5 remaining

Sunday-Wednesday: 341 tasks entered, 10 remaining.

Saturday
Jun062015

FVP Statistics Updated

After one week using the FVP method, how have I done?

Total number of tasks entered: 603

Total number of tasks completed: 531

Total number of tasks remaining: 72

The first 149 tasks have all been actioned.

Work done yesterday (Friday):

No. of tasks entered during day: 91

No. of those tasks actioned during day: 52

No. of those tasks unactioned at close of day: 39

No. of tasks actioned from previous days: 37

Total tasks actioned during day: 89

Note that the number of tasks currently remaining on the list (72) is less than the number of tasks I succeeded in doing yesterday (89).

Friday
Jun052015

FVP Statistics

I started my present FVP list during the evening of 30 May, a bit short of a week ago. So I thought it would be a good idea to show how my list has developed - particularly in view of some concerns which have been voiced about whether difficult tasks would ever get done using the algorithm.

I’ve used the same algorithm all the time I’ve been working this list. I have however varied the question. I started with “What is more exciting than x?” and then changed it to a questionless sort in which tasks were dotted according to whether they “stood out” or not. Currently I think this questionless sort is superior to using a question.

Anyway, here are the statistics:

Total number of tasks entered: 441

Total number of tasks completed: 376

Total number of tasks remaining: 65

I am using a notebook with 31 lines to the page. The pages are not relevant to the sort, but the distribution of unactioned tasks may be of interest.

Number of tasks remaining per page (with cumulative total):

Page 1        0         0

Page 2        0         0

Page 3        0         0

Page 4        3         3

Page 5        3         6

Page 6        2         8

Page 7        5       13

Page 8        4       17

Page 9        4       21

Page 10      2       23

Page 11      2       25

Page 12    10       35

Page 13      9       44

Page 14     15      59

Page 15      6       65

 

A couple of things to note about this:

1) The first 93 tasks on the list have all been actioned in less than a week.

2) No pages except the last one have more than half their tasks unactioned. (The last page only contains 7 tasks at present).

 

Yesterday’s tasks (4 June)

I kept a record (by using a different coloured ink) of what tasks I entered yesterday and what tasks I completed.

No. of tasks entered during day: 74

No. of those tasks actioned during day: 40

No. of those tasks unactioned at close of day: 34

No. of tasks actioned from previous days: 22

Total tasks actioned during day: 66

Note that the number of tasks currently remaining on the list (65) is slightly less than the number of tasks I succeeded in doing yesterday (66).

Wednesday
May272015

A Day with FVP

Here’s what I managed to do today using FVP. The tasks are in the order in which they are written on my list rather than the order I actually did them.

  • Phone upgrade
  • Reading in the Hadith
  • “Penguin Book of Greek Verse”
  • Voicemail
  • Tidy Office
  • Do the Dishes
  • Make Tea
  • Take Pills
  • Check Diary
  • Prayer
  • Prayer
  • Blood Pressure
  • Breakfast
  • Computer Housekeeping
  • Lunch
  • Push Ups
  • Paper In-Tray
  • Bring Wheelie Bin In
  • “Harry Potter à l’école des sorciers”
  • Website Comments
  • Read Blogs
  • Glossika French Day 29
  • Prayer
  • Record Weight
  • Computer Housekeeping
  • “The Iliad” (in Greek)
  • Glossika French Day 29
  • Computer Housekeeping
  • Computer Housekeeping
  • Email
  • “Harry Potter à l’école des sorciers”
  • Computer Housekeeping
  • Push Ups
  • Push Ups
  • Computer Housekeeping
  • “Harry Potter à l’école des sorciers”
  • Email Backlog
  • Email
  • Email Backlog
  • Glossika French Day 30
  • Book of Genesis (in Hebrew) - one chapter
  • Wash Up
  • Gospel of Matthew (in Greek) - one chapter
  • Book of Genesis (in Hebrew) - one chapter
  • Glossika French Day 31
  • Glossika French Day 32
  • Book of Genesis (in Hebrew) - one chapter
  • Gospel of Matthew (in Greek) - one chapter
  • Email Backlog
  • “Harry Potter à l’école des sorciers”
  • Reading in the Hadith
  • The Plank
  • Find Mislaid Timer
  • Write This Blog Post

One thing I’d like to draw attention to is the effectiveness of the system in hammering home projects which require cumulative repetion over a long period. There are several examples of this in the list. I’ll mention only two. “Harry Potter à l’école des sorciers” (the first volume of the Harry Potter series in French) had four sessions and there were three sessions of push ups. Keeping projects like these - reading, language training and fitness training - going day after day with multiple sessions per day really produces results and FVP is excellent at this.

By the way, the idea with the Harry Potter book is that once I’ve finished it in French, I’ll then use the French edition as a crib for the Spanish edition, then the Spanish edition as a crib for the Italian edition, then the Italian edition for the German edition, and the German edition for… who knows which language? Maybe Dutch, maybe Modern Greek. Russian might be too much of a stretch.

Friday
May082015

The Perfect Time Management System

For millenia the best minds in the world have been searching for the perfect time management system. Finally, after twenty years of thinking about little else (or at least that’s how it felt), I have at last managed to invent it.

I hope this will be an incalculable boon to humankind. Imagine, no more frustration at not being able to trust yourself to achieve what you want. Imagine, always being able to decide to do something and know that you will do it. Imagine, being able to unfailingly steer the optimum path through all the clashing priorities of daily life.

The system is very simple. Once you know it you will be hard pressed to think why it would take one person five minutes to think up, let alone twenty years. Yet, as far as I know no one else has ever thought of it before.

Here are a few characteristics of the system:

  • It’s a “universal capture” system, i.e. you can enter any task or project without any pre-editing or prioritizing.
  • It’s equally suitable for pen and paper or electronic means.
  • It can deal with any size list, from the smallest to the largest.
  • No matter what order the tasks are written in, it will always give you the optimum path through them.
  • It has no problem with urgent tasks.
  • It encourages “little and often”.
  • You can attend meetings and write down tasks and queries straight into the list.
  • Resistance becomes a thing of the past.
  • You can enter provisional tasks, i.e. ones you haven’t decided definitely whether to do them or not.
  • You can brainstorm straight onto the list
  • It requires no randomizers or other equipment.
  • and so on.

I’ll be writing more about this in a week or so’s time.